Plant overview
North Process PlantAll areas

Plant overview

North Process Plant · operational knowledge summary · updated moments ago
11
Recurring failures detected
3 assets, last 6 months
1
Assets with incomplete evidence records
evidence health below 65
7
Unresolved actions across open investigations
2
Compliance gaps open
expired, missing or conflicting

Top bad-actor assets

P-117Process Pump
Rotating Equipment · evidence health 58%
Watch
HX-221Heat Exchanger
Process · evidence health 72%
Watch

Recurring failures detected

P-117 — 3 seal-leak events
14 Jan → 18 Jun 2026 · unresolved RCA
High severity
HX-221 — 2 fouling events
22 Apr, 26 Jun 2026 · strainer suspected
Watch
C-204 — 2 high-temperature events
24 Feb, 07 May 2026 · cooling-water suspected
Watch

Expiring or expired evidence

SOP-MECH-017
Pump alignment and seal inspection
Expired
API-610
Centrifugal pump design audit
Missing

Recently ingested documents

OEM Manual — P-117
oem manual · 2026-06-20
doc_010
RCA-P091 — Sludge Pump
rca report · 2026-05-11
doc_011
Expert Note — ETP Vibration
expert note · 2026-06-28
doc_012
SOP-MECH-017 — Pump Alignment
procedure · 2026-03-15
doc_013
Inspection Report — HX-221
inspection · 2026-07-01
doc_014

Expert knowledge awaiting validation

Recurring vibration on ETP pumps
Senior rotating-equipment technician · pending review
Pending
Cooling-water strainer scaling pattern
Utilities shift lead · pending review
Pending
Foundation bolt check before re-seal
Reliability engineer · pending review
Pending

Graph coverage by plant area

Rotating Equipment
2 assets modelled
Process
2 assets modelled
Utilities
2 assets modelled