Plant overview
North Process Plant · operational knowledge summary · updated moments ago
11
Recurring failures detected
3 assets, last 6 months
1
Assets with incomplete evidence records
evidence health below 65
7
Unresolved actions across open investigations
2
Compliance gaps open
expired, missing or conflicting
Top bad-actor assets
P-117 — Process Pump
Rotating Equipment · evidence health 58%
HX-221 — Heat Exchanger
Process · evidence health 72%
Recurring failures detected
P-117 — 3 seal-leak events
14 Jan → 18 Jun 2026 · unresolved RCA
HX-221 — 2 fouling events
22 Apr, 26 Jun 2026 · strainer suspected
C-204 — 2 high-temperature events
24 Feb, 07 May 2026 · cooling-water suspected
Expiring or expired evidence
SOP-MECH-017
Pump alignment and seal inspection
API-610
Centrifugal pump design audit
Recently ingested documents
OEM Manual — P-117
oem manual · 2026-06-20
RCA-P091 — Sludge Pump
rca report · 2026-05-11
Expert Note — ETP Vibration
expert note · 2026-06-28
SOP-MECH-017 — Pump Alignment
procedure · 2026-03-15
Inspection Report — HX-221
inspection · 2026-07-01
Expert knowledge awaiting validation
Recurring vibration on ETP pumps
Senior rotating-equipment technician · pending review
Cooling-water strainer scaling pattern
Utilities shift lead · pending review
Foundation bolt check before re-seal
Reliability engineer · pending review
Graph coverage by plant area
Rotating Equipment
2 assets modelled
Process
2 assets modelled
Utilities
2 assets modelled